Make sure all parts have been received.
Dasma roll up door installation instructions.
The stripping is.
Locate the second fusible link within 12 inches of the ceiling on the door side of the wall.
Delivers easy one pull access to your shelter.
Order this size so the panels will be made slightly smaller fitting perfectly in the doorway.
Pull eaze roll up door kit.
Fits all double zippered door fabric garages shelters and to quickly open doors using a simple pulley system.
Door hard to operate in one direction.
B bottom rail of door rolls up out of parallel with roll of door.
See fig 7 it is recommended to slide gutter cap ends in place and pre drill thru the cap ends and apply fasteners above door guides through the gutter end cap holes after they are installed see fig 8.
Fits garage shelter and shed door opening widths up to 12 feet.
Roll up door installation manuals how to install steel roll up doors dbci skip to main content.
Roll up door installation guide.
To avoid injury keep hands and fingers clear of section joints warning track and other door parts while the door is moving.
Watch your hands and fingers using the template mark and drill 2 holes of 1 2 diameter at 2 1.
Use the pull eaze roll up door kit to easily gain access to your shelter.
Do not install a link or.
Read the manufacturer s instructions regarding the fire door release assembly.
Face of the door.
Step 1 measure the garage door opening before purchasing panels.
Find installation manuals and technical information on dbci s commercial and self storage doors and products here.
C edge of roll is not flush i e.
A door rolls up crooked.
Locate the first fusible link near the headplate s and allow for sufficient movement of the sash chain cable to release the closing mechanism s.
Installation instructions series a aa roller doors page 4 installation faults and remedies faults 1.
Door hard to operate in both directions.
At a home improvement store purchase some rubber weather stripping.
Lay the panel flat on a workbench.
Roll up door installation instructions and safety guidelines.
Be sure to use fasteners short enough not to scratch or obstruct the door.
Use a tape measure to carefully record the length and width of the opening.
Access systems manufacturs association dasma a new safety standard for usa residential garage doors dasma 116.
Below is a list of all the parts you need to install your door.
At this time pre drill using a 7 32 drill.
The panels will be about 1 4 in 6 4 mm smaller than the opening step 2 lay weather stripping over the bottom door panel.
If parts are missing notify industrial door solution immediately.